Introduction to Key Features
Last updated June 12, 2024
Introduction: RatedPower offers a comprehensive set of tools designed to streamline your PV project development. This guide introduces you to the key features available on the platform.
Step-by-Step Instructions:
- Project Creation:
- Go to the "Projects" tab on the dashboard.
- Click "New Project" and enter basic project details such as project name, location, and capacity.
- Save your new project to begin the design process.
- Design and Layout Tools:
- Navigate to the "Design" section.
- Use the layout tools to create and optimize the design of your PV plant.
- Adjust parameters such as module type, inverter settings, and array layout.
- Energy Yield Simulation:
- Access the "Energy Yield" tab.
- Run simulations to estimate the energy production of your PV plant.
- Analyze results to optimize system performance and identify potential improvements.
- Financial Analysis:
- Go to the "Financials" section.
- Use the built-in calculators to estimate CAPEX, OPEX, and LCOE.
- Generate financial reports to support project proposals and decision-making.
- Report Generation:
- In the "Reports" tab, compile detailed project documentation.
- Include design layouts, energy yield estimates, and financial analysis.
- Export reports in various formats for sharing with stakeholders.
Was this article helpful?